FPL contractors will be in the Village to perform trimming of vegetation under power lines. This maintenance is scheduled on a regular basis throughout the Village by FPL.

Work will commence the week of April 15th in the areas shown in these maps.

Residents should expect temporary detours and possible one lane closures due to tree-trimming vehicles and equipment. Personnel will require access to power lines located on poles along the utility easement in certain backyards.

0
0
0
0
0